1
Are you a resident of the City of Maple Valley?
Are you a resident of the City of Maple Valley?
2
Do you work within the City of Maple Valley
 *
Do you work within the City of Maple Valley
3
How often do you use the Witte Road Corridor?
How often do you use the Witte Road Corridor?
4
Do you use the Witte Road Corridor to commute to and from work?
 *
Do you use the Witte Road Corridor to commute to and from work?
5
Do you or your family currently walk or bicycle along the Witte Road Corridor
 *
Do you or your family currently walk or bicycle along the Witte Road Corridor

This project is divided into 5 distinct segments. (Each segment has recommended improvements listed below). Of the 5 segments listed below, which 2 segments do you believe are the highest priorities/most important (mark 1 and 2):

  • SR 516 north to 222nd Place SE (BLUE)
    • 3 lane roadway section
    • Bike lanes and sidewalks on both sides
    • Intersection improvement / realignment at 222nd Place SE

  • 222nd Place SE to SE 256th Street (PINK)
    • 2 lane roadway section except for the intersection of Lake Wilderness Country Club Drive, which will widen to a 3 lane section
    • Bike lanes both way with 8 foot mixed use path

  • SE 256th Street to 219th Place SE (YELLOW)
    • Expand to 3 lane section
    • Pedestrian crossings at major intersections
    • Realign intersection of SE 256th Street
    • Improve intersection of SE 254th

  • SE 219th Place to SE 249th Place (GREEN)
    • 2 lane roadway section (similar to the 222nd Place SE to SE 256th Street section)
    • Expand to 3 lane section south of SE 250th Place and improve the SE 250th Place intersection with crosswalks
    • Continue 3 lane section from SE 250th Place to SE 249th Place

  • SE 240th Street to SR169 (ORANGE)
    • 3 lane section to SR169
    • Sidewalk on east side of road
    • Bike lanes on both sides of road, connecting from SE 240th Street to SR 169
    • Landscaping on west side of road and move guard rail further west
    • Pedestrian crossing at SE 237th Street

To view the segments, click on the Witte Road Corridor Figure [PDF].

6
Selection 1
 *
7
Selection 2
 *
8
Why are these 2 segments important to you?
9
This project is exploring the option of providing a pedestrian connection from Witte Road to the Lake Wilderness Trail (Cedar to Green River) at approximately SE 237th Street. How important is this to you?
 *
This project is exploring the option of providing a pedestrian connection from Witte Road to the Lake Wilderness Trail (Cedar to Green River) at approximately SE 237th Street. How important is this to you?
10
Why did you rate this connection to the Lake Wilderness Trail from Witte Road this way? (i.e. “ I would not likely ever use this connection.” or “This would be very useful to me and my family and we would find it to be very useful.”)

North of the the intersection of Witte Road and Lake Wilderness the center lane can be configured in one of two ways for:

      Option A – Left turn pocket into Lake Wilderness Golf Course; OR
      Option B – Merge lane for northbound movement from 254th

11
Which option do you prefer?
 *
Which option do you prefer?
12
Do you have any other comments on the improvement of the Witte Road Corridor?
  1. To receive a copy of your submission, please fill out your email address below and submit.